skip to main |
skip to sidebar
Last week I finished my Zephyr Cove. After a quick bath and blocking, it was ready for the weekend trip to Vermont.
This design has three sections and is finished with a lace border.
Zephyr Cove moved right along. As soon as I tired of one section, it was time to shift gears and move on to the next one - from solid garter to stripes to short rows.
Throw in a picot edge and you have an entertaining project.
This asymmetrical shawl has an overall crescent shape, so it stays in place without a lot of fuss.
The yarn is Dirty Water DyeWorks Bertha, colorways Bee Hive and Slate. Both of these have been available only at shows but will be posted to the website soon.
This shawl is substantially long from tip to tip. Bertha is a soft yarn with plenty of drape, so it doesn't feel heavy or cumbersome.
I made one slight modification.
I added the whimsical owl bead to the tip of the Bee Hive section.
The other day I had several hours of waiting at the hospital. I left the house prepared with a couple knitting projects in tow. Even the simplest procedure can take longer than expected, and I wasn't going to take any chances.
Once I was situated in a comfy waiting area at the hospital, I pulled out my knitting. It didn't take long for one of the nurses to comment. "Those are tiny stitches," she said. She went on to explain that it was going to take me a long time to finish. I was working with US 5 needles. As someone who knits socks on small needles, US 5 seemed almost hefty. It all depends on your perspective, I guess. The nurse was very friendly, and I didn't debate the point. We had a nice chat about knitting.
Later in the day I found myself in a different waiting area. Again, one of the nurses commented - pretty colors, looks soft. "The yarn has a bit of cashmere," I explained. She went on to tell me that she had recently taken up crochet. We continued to discuss the personal satisfaction that comes from making something with your own hands. She even pulled out her phone to show me pictures of things she had made - fruit, animals, all sorts of 3-D objects. She uses them as gift items. It was a delightful conversation.
I always enjoy unexpected conversations that spring up around knitting. People are so willing to share information about what they make and why they make it. I especially enjoyed these two because they broke up the monotony of a long wait.
A quick progress update on Zephyr Cove.
I finished the striped section and have done a few rows of the short row section. The beauty of this design is the variety. I enjoyed knitting the stripes and just when I had had my fill, it was time to move on to the next section. This project wasn't a priority, but now I'm hooked. Like a good book, I have to keep going to see how it ends.
Over the weekend I was reminded of the benefit of having more than one knitting project under construction. The project I had planned to work on hit a snag . . . a snag that doesn't have a quick and easy fix. In fact the only solution might be a completely different yarn base, but that requires time to order and dye the yarn.
Instead of fretting, I let go of that project and turned my attention to one where I could easily make forward progress.
Zephyr Cove to the rescue. This project isn't too taxing. I've moved from solid garter to striped garter. Back and forth, back and forth . . . creating stripes while I ponder my problem project.
This is the third and final week for Monday travel days. While I do love traveling, I'm ready for my normal weekly routine. Today has to be a dual-purpose day for both Monday and Tuesday. I'm bracing myself for a long one.
Last week I trekked across the Canadian border again.
Life is a balancing act, and the trip was a combination of work and play.
The CN Tower.
Yes, I went up. No, I didn't get sick. A ride to the top was my daughter's idea. In all fairness, it wasn't as bad as I thought it was going to be.
Since I'm a baseball fan . . .
The obligatory ballpark shot.
I have fond memories of growing up with Hudson's Bay point blankets. They speak of winter, cold nights and snuggling under the covers.
I see a new project in my future.
As if traveling with teens wasn't challenging enough, I ran into a bit of a knitting crisis. Once we were settled in for our stay in Toronto, I pulled out my knitting only to discover I didn't have the needles I was sure I had packed. I turned everything inside out and upside down. The needles I needed to start my project were nowhere to be found.
Like any good knitter, I rose to the occasion. I went in search of needles and found some.
The new project is up and running.
Zephyr Cove.
After I had worked a few rows of this project, I realized it's very similar in construction to another one in the works - Miss Winkle. Both are asymmetrical, garter stitch shawls. At least I'm consistent.
We made a quick stop at Niagara Falls on the way home.
It's easy to lose track of time when you're traveling. Just like that, it's Tuesday . . . time to get back to work.