I have two active projects right now if you don't count the sock that's under construction. I've been pretty focused on my Starting Point, but the other day I decided to mix it up, so I bounced over to the other project.
It turns out Portland Sequence has a lot in common with Starting Point.
More stripes. I can't seem to get enough of them.
Our farmers' market opened this week, and I'm thrilled. All I need to do is add rhubarb to this week's color inspiration.
Ready for pie.
Showing posts with label Starting Point. Show all posts
Showing posts with label Starting Point. Show all posts
Friday, June 16, 2017
Monday, June 12, 2017
A Knitting Day
Every once in a while I declare a knitting day, and yesterday was one of those days. On Saturday I had a long, lovely day at Squam, so I was ready to unplug and take a day off. No work, no email, no cooking. I did a quick tidy in the kitchen and took the dog out, but that was it.
If I'd been more virtuous, I would have woven in some of these ends.
Note that I have another set of ends identical to this colorful mess. That's a lot of weaving in, and I haven't even finished the project yet.
But I wasn't virtuous. Instead I knit my way through the day and made a few more ends along the way.
Starting Point MKAL. The final clue for this project was released the other day. I'm playing catch-up, and I'm curious how all of this is going to come together. Today I'm still behind, but this was the perfect project for a day off. Miles of striped garter with a bit of eyelet thrown in for good measure.
If I'd been more virtuous, I would have woven in some of these ends.
Note that I have another set of ends identical to this colorful mess. That's a lot of weaving in, and I haven't even finished the project yet.
But I wasn't virtuous. Instead I knit my way through the day and made a few more ends along the way.
Starting Point MKAL. The final clue for this project was released the other day. I'm playing catch-up, and I'm curious how all of this is going to come together. Today I'm still behind, but this was the perfect project for a day off. Miles of striped garter with a bit of eyelet thrown in for good measure.
Monday, May 22, 2017
Chasing Clues
On Saturday I had a long, busy day in Rhode Island, so when I woke up on Sunday, I was ready to take it easy. I shifted my expectations for the day and grabbed one of the knitting projects near the top of my heap.
When I first heard about the Starting Point MKAL, I was mildly interested. After I had assembled a few kits with different color combinations, I was in.
This MKAL is being released in a series of five clues, and already I'm behind. The second clue was released on Friday, but I'm still working my way through the first one. I finished one triangle, and now I need to knit another one just like it to complete the first clue. Only then can I start the second clue. I'm not sure I'll be able to catch up, but I'm playing by the rules.
When I first heard about the Starting Point MKAL, I was mildly interested. After I had assembled a few kits with different color combinations, I was in.
This MKAL is being released in a series of five clues, and already I'm behind. The second clue was released on Friday, but I'm still working my way through the first one. I finished one triangle, and now I need to knit another one just like it to complete the first clue. Only then can I start the second clue. I'm not sure I'll be able to catch up, but I'm playing by the rules.
Subscribe to:
Posts (Atom)





